CAUTION / NOTICE / HINT
HINT:
PROCEDURE
|
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
|
2. |
CUSTOMER PROBLEM ANALYSIS |
HINT:
|
What |
Vehicle model, system name |
|
When |
Date, time, occurrence frequency |
|
Where |
Road conditions |
|
Under what conditions? |
Driving conditions, weather conditions |
|
How did it happen? |
Problem symptoms |
|
|
3. |
PRE-CHECK |
(a) Measure the battery voltage.
Standard Voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding to the next step.
(b) Check the fuses and relays.
(c) Check the connectors and terminals to make sure that there are no abnormalities such as a loose connection or deformation.
|
|
4. |
INSPECT COMMUNICATION FUNCTION OF CAN COMMUNICATION SYSTEM* |
(a) Using the Techstream, check for CAN communication system DTCs.
Click here
|
Result |
Proceed to |
|---|---|
|
CAN DTCs are not output |
A |
|
CAN DTCs are output |
B |
| B | |
GO TO CAN COMMUNICATION SYSTEM
|
|
|
5. |
INSPECT COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM* |
(a) Using the Techstream, check for LIN communication system DTCs.
Click here
|
Result |
Proceed to |
|---|---|
|
LIN DTCs are not output |
A |
|
LIN DTCs are output |
B |
| B | |
GO TO DIAGNOSTIC TROUBLE CODE CHART
|
|
|
6. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Terminals of ECU
Click here
(b) Data List / Active Test
Click here
|
|
7. |
REPAIR OR REPLACE |
|
|
8. |
CONFIRMATION TEST |
| NEXT | |
END |
System Description
Terminals Of EcuToyota CH-R Service Manual > How To Troubleshoot Ecu Controlled Systems: Electronic Circuit Inspection Procedure
ELECTRONIC CIRCUIT INSPECTION PROCEDURE
BASIC INSPECTION
(a) WHEN MEASURING RESISTANCE OF ELECTRONIC PARTS
(1) Unless otherwise stated, all resistance measurements are standard values
measured at an ambient temperature of 20°C (68°F). Resistance measurements may be
inaccurate if measured at ...
Toyota CH-R Service Manual > Rear Door Outside Moulding: Reassembly
REASSEMBLY
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE
1. INSTALL NO. 2 OUTSIDE MOULDING RETAINER
(a) When using a new rear door rear outside moulding:
(1) Clean the surface of a new r ...