INSTALLATION
PROCEDURE
1. INSTALL OIL CLEANER (CVT) MAGNET
|
(a) Install the 2 oil cleaner (CVT) magnets to the transaxle oil (CVT) pan sub-assembly. |
|
2. INSTALL TRANSAXLE OIL (CVT) PAN SUB-ASSEMBLY
(a) Clean the transaxle oil (CVT) pan sub-assembly installation surface of the continuously variable transaxle assembly.
(b) Install a new transaxle oil pan (CVT) gasket to the transaxle oil (CVT) pan sub-assembly.
(c) Install the transaxle oil (CVT) pan sub-assembly to the continuously variable transaxle assembly with the 19 bolts.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(d) Using a 6 mm hexagon socket wrench, install the No. 1 transmission oil filler tube to the transaxle oil (CVT) pan sub-assembly.
Torque:
1.7 N·m {17 kgf·cm, 15 in·lbf}
(e) Using a 6 mm hexagon socket wrench, temporarily install the gasket and overflow plug to the transaxle oil (CVT) pan sub-assembly.
HINT:
Reuse the old gasket as the overflow plug will be removed again to adjust the fluid level.
(f) Using a 10 mm hexagon socket wrench, install a new gasket and drain plug to the transaxle oil (CVT) pan sub-assembly.
Torque:
49 N·m {500 kgf·cm, 36 ft·lbf}
3. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID
Click here
4. INSPECT FOR FLUID LEAK
5. INSTALL REAR ENGINE UNDER COVER LH
Click here
6. INSTALL NO. 1 ENGINE UNDER COVER
Click here
RemovalToyota CH-R Service Manual > Seat Heater System: How To Proceed With Troubleshooting
CAUTION / NOTICE / HINT
HINT:
Use the following procedure to troubleshoot the seat heater system.
*: Use the Techstream.
PROCEDURE
1.
VEHICLE BROUGHT TO WORKSHOP
NEXT
...
Toyota CH-R Service Manual > Black Out Tape(for Front Door): Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration)
that must be performed after parts are removed and installed, or replaced during
the black out tape removal/installation are shown below.
Necessary Procedure After Parts Removed/ ...