INSTALLATION
PROCEDURE
1. ADJUST COMPRESSOR OIL
(a) When replacing the compressor with pulley assembly with a new one, gradually discharge the refrigerant gas from the service valve. Then drain the following amount of oil from the new compressor with pulley assembly before installation, so that the amount of oil contained in it is the same as that in the cooler compressor with pulley assembly to be replaced. Standard: Standard: (The amount of oil inside a new cooler compressor with pulley assembly: 80 (+15) cc (2.71 (+0.507) fl.oz.)) - (The amount of oil remaining in the removed compressor with pulley assembly A) = (The amount of oil to be removed when replacing the cooler compressor with pulley assembly) HINT: A new cooler compressor with pulley assembly is filled with sufficient oil for the whole cycle. Therefore, it is necessary to drain residual oil from the condenser and cooling unit. Example: If A is 45 cc (1.52 fl.oz.). Since this time 80 cc (2.82fl.oz.) - 45 cc (1.52 fl.oz.) =35 cc (1.18 fl.oz.), drain 35 cc (1.18 fl.oz.) of the oil from the new cooler compressor with pulley assembly. NOTICE:
|
|
2. INSTALL COMPRESSOR WITH PULLEY ASSEMBLY
(a) Using an E8 "TORX" socket wrench, temporarily install the compressor with pulley assembly with the 2 stud bolts.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(b) Temporarily install the 2 bolts and 2 nuts. |
|
(c) Tighten the 2 bolts and 2 nuts to install the compressor with pulley assembly in the order as shown in the illustration.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
3. CONNECT SUCTION HOSE SUB-ASSEMBLY
(a) Remove the vinyl tape from the suction hose sub-assembly.
(b) Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor with pulley assembly.
Compressor Oil:
VC100YF or equivalent
(c) Install the O-ring to the suction hose sub-assembly.
NOTICE:
Keep the O-ring and O-ring fitting surface free of foreign matter.
(d) Connect the suction hose sub-assembly to the compressor with pulley assembly with the bolt.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
4. CONNECT DISCHARGE HOSE SUB-ASSEMBLY
(a) Remove the vinyl tape from the discharge hose sub-assembly.
(b) Apply sufficient compressor oil to a new O-rings and fitting surfaces of the cooler compressor with pulley assembly.
Compressor Oil:
VC100YF or equivalent
(c) Install the O-ring to the discharge hose sub-assembly.
NOTICE:
Keep the O-ring and O-ring fitting surface free of foreign matter.
(d) Connect the suction hose sub-assembly to the compressor with pulley assembly with the bolt.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(e) Connect the connector.
5. INSTALL FAN AND GENERATOR V BELT
Click here
6. INSTALL NO. 1 ENGINE UNDER COVER
Click here
7. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT (for HFC-134a(R134a))
Click here
8. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT (for HFO-1234yf(R1234yf))
Click here
9. WARM UP ENGINE (for HFC-134a(R134a))
Click here
10. WARM UP ENGINE (for HFO-1234yf(R1234yf))
Click here
11. INSPECT FOR REFRIGERANT LEAK (for HFC-134a(R134a))
Click here
12. INSPECT FOR REFRIGERANT LEAK (for HFO-1234yf(R1234yf))
Click here
Toyota CH-R Service Manual > Power Door Lock Control System: Operation Check
OPERATION CHECK
CHECK POWER DOOR LOCK OPERATION
NOTICE:
The operation check below is based on the non-customized initial condition of
the vehicle.
(a) Check basic functions.
(1) Check that all of the doors lock when the lock side of the door control switch
is pressed.
(2) Check that all of ...
Toyota CH-R Service Manual > Airbag System: Short in Curtain Shield Squib LH Circuit (B1835/58-B1838/58)
DESCRIPTION
The curtain shield squib LH circuit consists of the airbag sensor assembly and
curtain shield airbag assembly LH.
The airbag sensor assembly uses this circuit to deploy the airbag when deployment
conditions are met.
These DTCs are stored when a malfunction is detected in the curta ...