INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
|
(a) Engage the guides to install the air conditioning radiator assembly. |
|
(b) Install the 2 screws.
|
(c) Engage the guide. |
|
(d) Connect the connector.
2. INSTALL NO. 3 INSTRUMENT PANEL WIRE (w/ PTC Heater)
Click here
3. INSTALL NO. 2 AIR DUCT
Click here
4. INSTALL AIR CONDITIONER UNIT ASSEMBLY
Click here
Disassembly
ReassemblyToyota CH-R Service Manual > Wireless Door Lock Control System(w/o Smart Key System): System Diagram
SYSTEM DIAGRAM
Communication Table
Sender
Receiver
Signal
Line
Main Body ECU
(Multiplex Network Body ECU)
Combination Meter Assembly
Wireless door lock hazard warning light request signal
CAN
...
Toyota CH-R Service Manual > K114 Continuously Variable Transaxle Fluid: Components
COMPONENTS
ILLUSTRATION
*1
REFILL PLUG
*2
OVERFLOW PLUG
*3
NO. 1 TRANSMISSION OIL FILLER TUBE
*4
DRAIN PLUG
*5
NO. 1 ENGINE UNDER COVER
*6
REAR ENGINE U ...