INSPECTION
CAUTION / NOTICE / HINT
NOTICE:
Click here
PROCEDURE
1. INSPECT POWER WINDOW REGULATOR MOTOR ASSEMBLY LH
(a) Connect a positive (+) battery lead to connector terminal 2 (B). NOTICE: Do not connect a positive (+) battery lead to any terminals other than terminal 2 (B) to avoid damaging the pulse sensor inside the motor. |
|
(b) Connect a negative (-) battery lead to connector terminals 1 (GND) and 7 (DOWN) or 10 (UP).
(c) Check that the motor gear rotates smoothly as follows:
OK:
Measurement Condition |
Specified Condition |
---|---|
|
Motor gear rotates clockwise |
|
Motor gear rotates counterclockwise |
CAUTION:
Initialize the power window control system after installing the power window regulator motor and regulator assembly.
2. INSPECT POWER WINDOW REGULATOR MOTOR ASSEMBLY RH
(a) Connect a positive (+) battery lead to connector terminal 2 (B). NOTICE: Do not connect a positive (+) battery lead to any terminals other than terminal 2 (B) to avoid damaging the pulse sensor inside the motor. |
|
(b) Connect a negative (-) battery lead to connector terminals 1 (GND) and 7 (DOWN) or 10 (UP).
(c) Check that the motor gear rotates smoothly as follows:
OK:
Measurement Condition |
Specified Condition |
---|---|
|
Motor gear rotates counterclockwise |
|
Motor gear rotates clockwise |
CAUTION:
Initialize the power window control system after installing the power window regulator motor and regulator assembly.
Toyota CH-R Service Manual > Power Window Control System: Key-off Operation Function Operates even if Operating Conditions are not Satisfied
DESCRIPTION
When the front doors are closed, each power window regulator motor assembly can
be operated for approximately 45 seconds after the ignition switch is turned from
ON to off by receiving operation permission signals from the main body ECU (multiplex
network body ECU). However, when ...
Toyota CH-R Service Manual > Front Shock Absorber: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
1. INSTALL FRONT LOWER COIL SPRING INSULATOR
(a) Install the front lower coil spring insulator to the front shock absorber
as ...