INSPECTION
CAUTION / NOTICE / HINT
NOTICE:
Click here
PROCEDURE
1. INSPECT POWER WINDOW REGULATOR MOTOR ASSEMBLY LH
|
(a) Connect a positive (+) battery lead to connector terminal 2 (B). NOTICE: Do not connect a positive (+) battery lead to any terminals other than terminal 2 (B) to avoid damaging the pulse sensor inside the motor. |
|
(b) Connect a negative (-) battery lead to connector terminals 1 (GND) and 7 (DOWN) or 10 (UP).
(c) Check that the motor gear rotates smoothly as follows:
OK:
|
Measurement Condition |
Specified Condition |
|---|---|
|
Motor gear rotates clockwise |
|
Motor gear rotates counterclockwise |
2. INSPECT POWER WINDOW REGULATOR MOTOR ASSEMBLY RH
|
(a) Connect a positive (+) battery lead to connector terminal 2 (B). NOTICE: Do not connect a positive (+) battery lead to any terminals other than terminal 2 (B) to avoid damaging the pulse sensor inside the motor. |
|
(b) Connect a negative (-) battery lead to connector terminals 1 (GND) and 7 (DOWN) or 10 (UP).
(c) Check that the motor gear rotates smoothly as follows:
OK:
|
Measurement Condition |
Specified Condition |
|---|---|
|
Motor gear rotates counterclockwise |
|
Motor gear rotates clockwise |
Components
RemovalToyota CH-R Service Manual > Ptc Heater Assembly: Installation
INSTALLATION
PROCEDURE
1. INSTALL QUICK HEATER ASSEMBLY (for VALEO Made)
(a) Install the quick heater assembly with the 2 screws as shown in the illustration.
Install in this Direction
2. INSTALL QUICK HEATER ASSEMBLY (for DENSO Made)
(a) Engage the guide to insta ...
Toyota CH-R Service Manual > Can Communication System: Open in Bus 3 Main Bus Line
DESCRIPTION
There may be an open circuit in one of the CAN main bus lines when the resistance
between terminals 6 (CA3H) and 21 (CA3L) of the central gateway ECU (network gateway
ECU) is 70 Ω or higher.
Symptom
Trouble Area
Resistance between terminals 6 ...