INSTALLATION
PROCEDURE
1. INSTALL QUICK HEATER ASSEMBLY (for VALEO Made)
(a) Install the quick heater assembly with the 2 screws as shown in the illustration.
![]() |
Install in this Direction |
2. INSTALL QUICK HEATER ASSEMBLY (for DENSO Made)
(a) Engage the guide to install the quick heater assembly as shown in the illustration.
![]() |
Install in this Direction |
3. INSTALL NO. 2 HEATER COVER (for VALEO Made)
(a) Install the No. 2 heater cover with the screw. |
|
(b) Connect the connector. |
|
(c) Engage the clamp.
4. INSTALL NO. 2 HEATER COVER (for DENSO Made)
(a) Engage the guide and claw. |
|
(b) Install the No. 2 heater cover with the screw.
(c) Connect the 2 connectors. |
|
(d) Engage the clamp.
5. INSTALL NO. 1 AIR DUCT
Click here
6. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
7. INSTALL COWL SIDE TRIM BOARD LH
Click here
8. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
Toyota CH-R Service Manual > Quarter Garnish: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
1. INSTALL QUARTER PILLAR COVER SUB-ASSEMBLY
HINT:
When installing a new quarter pillar cover sub-assembly, heat the vehicle b ...
Toyota CH-R Service Manual > Air Conditioning System(for Automatic Air Conditioning System With Top-mounted
Air Conditioner Pressure Sensor): IG Power Source Circuit
DESCRIPTION
Power source voltage is supplied to the air conditioning amplifier assembly when
the ignition switch is turned ON. This power is used for operating the air conditioning
amplifier assembly, servo motors, etc.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
Inspect the fuses for ...