INSTALLATION
PROCEDURE
1. INSTALL FUEL LID OPENER SWITCH
(a) Engage the claws to install the fuel lid opener switch as shown in the illustration.
|
Install in this Direction |
2. INSTALL FUSE BOX OPENING COVER
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
7. INSTALL COWL SIDE TRIM BOARD LH
Click here
8. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
Inspection
Fuel Lid Opener SystemToyota CH-R Service Manual > Rain Sensor: Components
COMPONENTS
ILLUSTRATION
*1
RAIN SENSOR
*2
RAIN SENSOR COVER
*3
RAIN SENSOR TAPE
-
-
...
Toyota CH-R Service Manual > Oil Pan: Installation
INSTALLATION
PROCEDURE
1. INSTALL OIL CLEANER (CVT) MAGNET
(a) Install the 2 oil cleaner (CVT) magnets to the transaxle oil (CVT)
pan sub-assembly.
*1
Oil Cleaner (CVT) Magnet
...