INSTALLATION
PROCEDURE
1. INSTALL FUEL LID OPENER SWITCH
(a) Engage the claws to install the fuel lid opener switch as shown in the illustration.
![]() |
Install in this Direction |
2. INSTALL FUSE BOX OPENING COVER
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
7. INSTALL COWL SIDE TRIM BOARD LH
Click here
8. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
Toyota CH-R Service Manual > Rear Suspension: Rear Upper Arm
Components
COMPONENTS
ILLUSTRATION
*1
REAR SUSPENSION MEMBER SUB-ASSEMBLY
*2
REAR UPPER CONTROL ARM ASSEMBLY LH
*3
REAR UPPER CONTROL ARM ASSEMBLY RH
-
-
Tightening torque f ...
Toyota CH-R Service Manual > Air Conditioning Amplifier: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration)
that must be performed after parts are removed and installed, or replaced during
the air conditioning amplifier assembly removal/installation are shown below.
Necessary Procedure ...