INSTALLATION
PROCEDURE
1. INSTALL FUEL LID OPENER SWITCH
(a) Engage the claws to install the fuel lid opener switch as shown in the illustration.
|
Install in this Direction |
2. INSTALL FUSE BOX OPENING COVER
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
7. INSTALL COWL SIDE TRIM BOARD LH
Click here
8. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
Inspection
Fuel Lid Opener SystemToyota CH-R Service Manual > Tire / Wheel: Tire And Wheel
Components
COMPONENTS
ILLUSTRATION
*A
for Steel Wheel
-
-
*1
WHEEL ASSEMBLY
*2
WHEEL CAP
*3
AXLE HUB NUT
-
-
Tightening tor ...
Toyota CH-R Service Manual > Vacuum Warning Switch: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed, installed, or replaced during vacuum
warning switch assembly removal/installation are shown below.
Necessary Procedure After Part ...