INSTALLATION
PROCEDURE
1. INSTALL STEERING HEATER SWITCH
(a) Engage the 2 claws to install the steering heater switch to the fuse box opening cover.
|
Install in this direction |
2. INSTALL FUSE BOX OPENING COVER
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
5. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
6. INSTALL COWL SIDE TRIM BOARD LH
Click here
7. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
InspectionToyota CH-R Service Manual > Front Seatback Heater: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed, installed, or replaced during the
front seatback heater assembly removal/installation are shown below.
Necessary Procedure After ...
Toyota CH-R Service Manual > Shift Lever: Disassembly
DISASSEMBLY
PROCEDURE
1. REMOVE SHIFTING HOLE COVER SUB-ASSEMBLY
(a) Disengage the 4 guides and 6 claws to remove the shifting hole cover
sub-assembly from the upper console panel sub-assembly.
2. REMOVE SHIFT POSITION INDICATOR
...