INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH
|
*a |
Component without harness connected (Park/Neutral Position Switch) |
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
4 (B) - 9 (L) |
Shift lever in P or N |
Below 1 Ω |
|
Shift lever not in P or N |
10 kΩ or higher |
|
|
1 (RB) - 3 (PL) |
Shift lever in P |
Below 1 Ω |
|
Shift lever not in P |
10 kΩ or higher |
|
|
1 (RB) - 2 (RL) |
Shift lever in R |
Below 1 Ω |
|
Shift lever not in R |
10 kΩ or higher |
|
|
1 (RB) - 8 (NL) |
Shift lever in N |
Below 1 Ω |
|
Shift lever not in N |
10 kΩ or higher |
|
|
1 (RB) - 7 (DL) |
Shift lever in D or M |
Below 1 Ω |
|
Shift lever not in D or M |
10 kΩ or higher |
If the result is not as specified, replace the park/neutral position switch.
Removal
AdjustmentToyota CH-R Service Manual > Headlight Assembly(for Halogen Headlight): Disassembly
DISASSEMBLY
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
1. REMOVE HEADLIGHT PROTECTOR
(a) Remove the headlight protector.
2. ...
Toyota CH-R Service Manual > Door Lock: Door Control Relay
Components
COMPONENTS
ILLUSTRATION
*1
DOUBLE LOCK DOOR CONTROL RELAY ASSEMBLY
-
-
N*m (kgf*cm, ft.*lbf): Specified torque
-
-
Installation
INSTALLATION
PROCEDURE
1. INSTALL DOUBLE LOCK D ...