INSTALLATION
PROCEDURE
1. INSTALL BLIND SPOT MONITOR BUZZER
(a) Connect the connector.
(b) Engage the clamp to install the blind spot monitor buzzer.
2. INSTALL FUSE BOX OPENING COVER
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
5. INSTALL COWL SIDE TRIM BOARD LH
Click here
6. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
RemovalToyota CH-R Service Manual > Roof Headlining: Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL HEADLINING LIGHT CASE
(a) Align the markings on the roof headlining with the headlining light case
and install it using hot melt glue.
*a
Marking
-
-
2. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY
Click here ...
Toyota CH-R Service Manual > Front Door Outside Moulding: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH and LH sides.
The procedures listed below are for the LH side.
PROCEDURE
1. INSTALL FRONT DOOR OUTSIDE MOULDING
(a) Remove the peeling paper from the face of the outside moulding retainer.
HINT:
Af ...