Toyota CH-R Service Manual: Fuel Sender Open Detected (B1500)

DESCRIPTION

This DTC is stored when the combination meter assembly detects a fuel sender gauge assembly malfunction via a direct line.

DTC No.

Detection Item

DTC Detection Condition

Trouble Area

Memory

B1500

Fuel Sender Open Detected

When IG voltage is 9.5 V or more and the following condition is detected:

  • Average input signal of fuel sender gauge assembly is 630 Ω or more 3 times consecutively
  • Harness or connector
  • Fuel suction tube with pump and gauge assembly
  • Fuel sender gauge assembly
  • Combination meter assembly

-

WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:

When replacing the combination meter assembly, always replace it with a new one. If a combination meter assembly which was installed to another vehicle is used, the information stored in it will not match the information from the vehicle and a DTC may be stored.

PROCEDURE

1.

READ VALUE USING TECHSTREAM (FUEL INPUT)

(a) Connect the Techstream to the DLC3.

(b) Turn the ignition switch ON.

(c) Turn the Techstream on.

(d) Enter the following menus: Body Electrical / Combination Meter / Data List.

(e) Read the Data List according to the display on the Techstream.

Body Electrical > Combination Meter > Data List

Tester Display

Measurement Item

Range

Normal Condition

Diagnostic Note

Fuel Input

Fuel input

Min.: 0 L, Max.: 127.5 L

  • Fuel receiver gauge indicates

    F: 45.0 L

  • Fuel receiver gauge indicates

    3/4: 35.4 L

  • Fuel receiver gauge indicates

    1/2: 25.0 L

  • Fuel receiver gauge indicates

    1/4: 14.6 L

  • Fuel receiver gauge indicates

    E: 5.0 L

-

Body Electrical > Combination Meter > Data List

Tester Display

Fuel Input

Result

Proceed to

Fuel level data can be displayed on the Techstream

A

Fuel level data cannot be displayed on the Techstream

B

A

REPLACE COMBINATION METER ASSEMBLY

B

2.

INSPECT FUEL SENDER GAUGE ASSEMBLY (POWER SOURCE)

*a

Component with harness connected

(Combination Meter Assembly)

(a) Measure the voltage according to the value(s) in the table below.

Standard Voltage:

Tester Connection

Switch Condition

Specified Condition

F4-16 (FV) - Body ground

Ignition switch ON

4.5 to 5.5 V

NG

REPLACE COMBINATION METER ASSEMBLY

OK

3.

INSPECT FUEL SENDER GAUGE ASSEMBLY

*a

Component with harness connected

(Combination Meter Assembly)

(a) Measure the voltage according to the value(s) in the table below.

Standard Voltage:

Tester Connection

Switch Condition

Specified Condition

F4-23 (FR) - F4-15 (FE&B)

Ignition switch ON

0.2 to 4.7 V

OK

REPLACE COMBINATION METER ASSEMBLY

NG

4.

CHECK HARNESS AND CONNECTOR (FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY - COMBINATION METER ASSEMBLY)

(a) Disconnect the M14 fuel suction tube with pump and gauge assembly connector.

(b) Disconnect the F4 combination meter assembly connector.

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

M14-3 (FR) - F4-23 (FR)

Always

Below 1 Ω

M14-2 (FE) - F4-15 (FE&B)

Always

Below 1 Ω

M14-1 (FV) - F4-16 (FV)

Always

Below 1 Ω

F4-23 (FR) - Body ground

Always

10 kΩ or higher

F4-15 (FE&B) - Body ground

Always

10 kΩ or higher

F4-16 (FV) - Body ground

Always

10 kΩ or higher

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

OK

5.

INSPECT FUEL SENDER GAUGE ASSEMBLY

(a) Remove the fuel sender gauge assembly.

Click here

(b) Inspect the fuel sender gauge assembly.

Click here

NG

REPLACE FUEL SENDER GAUGE ASSEMBLY

OK

6.

INSPECT FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY

*a

Component without harness connected

(Fuel Suction Tube with Pump and Gauge Assembly)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

M14-1 (FV) - A-3

Always

Below 1 Ω

M14-2 (FE) - A-2

Always

Below 1 Ω

M14-3 (FR) - A-1

Always

Below 1 Ω

Result

Proceed to

OK

A

NG (w/o Canister Pump Module)

B

NG (w/ Canister Pump Module)

C

A

REPLACE COMBINATION METER ASSEMBLY

B

REPLACE FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY

C

REPLACE FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY

    Diagnostic Trouble Code Chart
    DIAGNOSTIC TROUBLE CODE CHART Meter / Gauge System DTC No. Detection Item Memory Link B1500 Fuel Sender Open Detected ...

    On-vehicle Inspection
    ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT COMBINATION METER ASSEMBLY (a) Check speedometer operation NOTICE: The combination meter assembly receives the vehicle speed signal from the ...

    Other materials:

    Toyota CH-R Service Manual > Rain Sensor: Removal
    REMOVAL PROCEDURE 1. REMOVE RAIN SENSOR COVER (a) Release the stopper by pulling it out as shown in the illustration. *a Stopper Release Remove in this Direction (b) Disconnect the rain sensor with rain sensor ...

    Toyota CH-R Owners Manual > Do-it-yourself maintenance: Light bulbs
    You may replace the following bulbs yourself. The difficulty level of replacement varies depending on the bulb. If necessary bulb replacement seems difficult to perform, contact your Toyota dealer. For more information about replacing other light bulbs, contact your Toyota dealer. Preparin ...

    Toyota CH-R Owners Manual

    Toyota CH-R Service Manual

    © 2017-2024 Copyright www.tochr.net
    0.0129