INSTALLATION
PROCEDURE
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect the 2 connectors to install the combination meter assembly.
(b) Engage the guides and clips. |
|
(c) Install the 2 screws.
2. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Click here
3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
Toyota CH-R Service Manual > Rear Crossing Traffic Alert Buzzer: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed and installed, or replaced during
the blind spot monitor buzzer removal/installation are shown below.
Necessary Procedures After P ...
Toyota CH-R Service Manual > K114 Cvt: Shift Lever Knob
Components
COMPONENTS
ILLUSTRATION
*1
SHIFT LEVER CAP
*2
SHIFT LEVER KNOB SUB-ASSEMBLY
Removal
REMOVAL
PROCEDURE
1. REMOVE SHIFT LEVER CAP
Click here
2. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
Remove in this ...