INSTALLATION
PROCEDURE
1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect the 2 connectors to install the combination meter assembly.
|
(b) Engage the guides and clips. |
|
(c) Install the 2 screws.
2. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Click here
3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Click here
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
Reassembly
Light Control RheostatToyota CH-R Service Manual > Key Reminder Warning System: Terminals Of Ecu
TERMINALS OF ECU
CHECK MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) AND INSTRUMENT PANEL JUNCTION
BLOCK ASSEMBLY
*A
Main Body ECU (Multiplex Network Body ECU) with 2 Connectors
-
-
*1
Main Body ECU (Multiplex Network Body EC ...
Toyota CH-R Service Manual > Console Box Light: Installation
INSTALLATION
PROCEDURE
1. INSTALL INSTRUMENT CLUSTER FINISH PANEL CENTER GARNISH
(a) Engage the claws to install the instrument cluster finish panel center garnish
as shown in the illustration.
Install in this Direction
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ...