On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT PTC HEATER RELAY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
*a |
Component without harness connected (PTC HTR NO. 1) |
*b |
Component without harness connected (PTC HTR NO. 2) |
*c |
Component without harness connected (PTC HTR NO. 3) |
- |
- |
Standard Resistance:
Tester Connection |
Condition |
Specified Condition |
---|---|---|
3 - 5 |
Battery voltage not applied between terminals 1 and 2 |
10 kΩ or higher |
3 - 5 |
Battery voltage applied between terminals 1 and 2 |
Below 1 Ω |
If the result is not as specified, replace the PTC heater relay.
Toyota CH-R Service Manual > Automatic Headlight Beam Level Control System: Initialization
INITIALIZATION
NOTICE:
The necessary procedures (adjustment, calibration, initialization or
registration) that must be performed after parts are removed and installed,
or replaced during headlight ECU sub-assembly LH removal/installation are
shown below.
Per ...
Toyota CH-R Service Manual > Automatic Headlight Beam Level Control System: Problem Symptoms Table
PROBLEM SYMPTOMS TABLE
NOTICE:
If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize
the vehicle information and initialize the headlight ECU sub-assembly LH.
Click here
HINT:
Use the table below to help determine the cause of problem symptoms. If multiple ...