INSTALLATION
PROCEDURE
1. INSTALL NO. 1 COOLER THERMISTOR
(a) Install the No. 1 cooler thermistor.
HINT:
Install the No. 1 cooler thermistor in the same area as the one that was previously installed.
2. INSTALL NO. 1 COOLER EVAPORATOR SUB-ASSEMBLY
Click here
3. INSTALL RADIATOR CASE SUB-ASSEMBLY
Click here
4. INSTALL HEAT EXCHANGER CASE
Click here
5. INSTALL COOLER EXPANSION VALVE
Click here
6. INSTALL HEATER RADIATOR UNIT SUB-ASSEMBLY
Click here
7. INSTALL HEATER CLAMP
Click here
8. INSTALL HEATER PIPE GROMMET
Click here
9. INSTALL NO. 2 AIR CONDITIONING RADIATOR DAMPER SERVO SUB-ASSEMBLY
Click here
10. INSTALL NO. 1 AIR CONDITIONING RADIATOR DAMPER SERVO SUB-ASSEMBLY
Click here
11. INSTALL AIR CONDITIONING HARNESS ASSEMBLY
Click here
12. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
Click here
13. INSTALL QUICK HEATER ASSEMBLY (w/ PTC Heater)
Click here
14. INSTALL NO. 2 HEATER COVER (w/ PTC Heater)
Click here
15. INSTALL HEATER COVER (w/o PTC Heater)
Click here
16. INSTALL BLOWER ASSEMBLY
Click here
Toyota CH-R Service Manual > Generator: Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp bracket to the generator assembly with the
bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
(b) Install the generator assembly with the 2 bolts.
Torque:
Bolt A :
25 N·m {255 kgf·cm ...
Toyota CH-R Service Manual > Quarter Garnish: Components
COMPONENTS
ILLUSTRATION
*1
NO. 2 REAR PILLAR GARNISH PROTECTOR
*2
QUARTER GARNISH MOULDING
*3
QUARTER PILLAR COVER SUB-ASSEMBLY
-
-
●
Non-reusable part
-
...