INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
|
(a) Engage the guides to install the air conditioning radiator assembly. |
|
(b) Install the 2 screws.
|
(c) Engage the guides. |
|
(d) Connect the connector.
2. INSTALL NO. 2 AIR DUCT
Click here
3. INSTALL AIR CONDITIONER UNIT ASSEMBLY
Click here
ReassemblyToyota CH-R Service Manual > Wheel Opening Moulding(for Rear): Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
1. INSTALL QUARTER OUTSIDE MOULDING
HINT:
When installing the quarter outside moulding, heat the vehicle body and quarter
ou ...
Toyota CH-R Service Manual > Theft Deterrent System: Terminals Of Ecu
TERMINALS OF ECU
CHECK INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY AND MAIN BODY ECU (MULTIPLEX NETWORK
BODY ECU)
*A
Main Body ECU (Multiplex Network Body ECU) with 2 Connectors
-
-
*1
Main Body ECU (Multiplex Network Body EC ...