INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
|
(a) Engage the guides to install the air conditioning radiator assembly. |
|
(b) Install the 2 screws.
|
(c) Engage the guides. |
|
(d) Connect the connector.
2. INSTALL NO. 2 AIR DUCT
Click here
3. INSTALL AIR CONDITIONER UNIT ASSEMBLY
Click here
ReassemblyToyota CH-R Service Manual > Compressor(for Denso Made): Installation
INSTALLATION
PROCEDURE
1. ADJUST COMPRESSOR OIL
(a) When replacing the compressor with pulley assembly with a new one,
gradually discharge the refrigerant gas from the service valve. Then drain
the following amount of oil from the new compressor with pulley assembly
before ...
Toyota CH-R Service Manual > Refrigerant Line: Removal
REMOVAL
PROCEDURE
1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM
for HFC-134a(R134a):
Click here
for HFO-1234yf(R1234yf):
Click here
2. REMOVE PIPING CLAMP (for DENSO Made)
(a) for Suction Hose Sub-assembly:
(1) While pressing the end of the sucti ...