INSTALLATION
PROCEDURE
1. INSTALL VACUUM WARNING SWITCH ASSEMBLY
(a) Install a new check valve grommet to the brake booster assembly.
(b) Install the vacuum warning switch assembly to the brake booster assembly as shown in the illustration. |
|
(c) Connect the connector to the vacuum warning switch assembly.
2. REMOVE BATTERY
Click here
3. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY
Click here
4. INSTALL COWL BODY MOUNTING REINFORCEMENT RH
Click here
5. INSTALL COWL BODY MOUNTING REINFORCEMENT LH
Click here
6. INSTALL WATER GUARD PLATE LH
Click here
7. INSTALL NO. 1 HEATER AIR DUCT SPLASH SHIELD SEAL
Click here
8. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
Click here
Toyota CH-R Service Manual > Rear Door Window Frame Moulding: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
1. INSTALL REAR DOOR REAR WINDOW FRAME MOULDING
(a) Using an air riveter or hand riveter with a nose piece, install the rear
...
Toyota CH-R Service Manual > Supplemental Restraint Systems: Airbag Cut-off Switch
Components
COMPONENTS
ILLUSTRATION
*1
AIRBAG CUT OFF SWITCH CYLINDER SUB-ASSEMBLY
*2
INSTRUMENT PANEL FINISH END PANEL RH
Removal
REMOVAL
PROCEDURE
1. REMOVE INSTRUMENT PANEL FINISH END PANEL RH
Click here
2. REMOVE AIRBAG CUT O ...