ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT RAIN SENSOR
(a) Disconnect the R1 rain sensor connector. |
|
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection |
Condition |
Specified Condition |
---|---|---|
R1-4 (SIG) - R1-2 (ES) |
Ignition switch ON |
11 to 14 V |
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection |
Condition |
Specified Condition |
---|---|---|
R1-2 (ES) - Body ground |
Always |
Below 1 Ω |
If the result is not as specified, repair or replace the harness or connector.
(d) Reconnect the R1 rain sensor connector. |
|
(e) Connect an oscilloscope to the rain sensor connector.
(f) Check for pulses.
OK:
Tester Connection |
Condition |
Specified Condition |
---|---|---|
3 (MPX) - 2 (ES) |
Ignition switch ON |
Pulse generation |
If the result is not as specified, replace the rain sensor.
Toyota CH-R Service Manual > Shift Lever: Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL SHIFT LEVER HOUSING BRACKET SUB-ASSEMBLY
(a) Engage the 4 claws to install the shift lever housing bracket sub-assembly
to the shift lock control unit assembly.
2. INSTALL SHIFT POSITION INDICATOR
( ...
Toyota CH-R Service Manual > Navigation System: Reverse Signal Circuit between Radio Receiver Assembly and Navigation ECU
DESCRIPTION
This circuit includes the navigation ECU and radio and display receiver assembly.
WIRING DIAGRAM
PROCEDURE
1.
CHECK HARNESS AND CONNECTOR (RADIO AND DISPLAY RECEIVER ASSEMBLY - NAVIGATION
ECU)
(a) Disconnect the F130 radio and display receiver a ...