INSTALLATION
CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. INSTALL FRONT LOWER BALL JOINT ASSEMBLY
(a) Secure the front axle assembly in a vise using aluminum plates.
NOTICE:
Do not overtighten the vise.
(b) Install the front lower ball joint assembly to the front axle assembly with the nut.
Torque:
133 N·m {1356 kgf·cm, 98 ft·lbf}
NOTICE:
(c) Install a new cotter pin.
NOTICE:
Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.
2. INSTALL FRONT AXLE ASSEMBLY
Click here
Toyota CH-R Service Manual > Steering Pad Switch: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed, installed, or replaced during the
steering pad switch assembly removal/installation are shown below.
Necessary Procedures After P ...
Toyota CH-R Service Manual > Electric Parking Brake System: Terminals Of Ecu
TERMINALS OF ECU
CHECK SKID CONTROL ECU (BRAKE ACTUATOR ASSEMBLY)
*a
Component without harness connected
(Skid Control ECU (Brake Actuator Assembly))
-
-
(a) Disconnect the A42 skid control ECU (brake actuator assembly) connectors.
(b) Me ...