INSTALLATION
CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. INSTALL FRONT LOWER BALL JOINT ASSEMBLY
(a) Secure the front axle assembly in a vise using aluminum plates.
NOTICE:
Do not overtighten the vise.
(b) Install the front lower ball joint assembly to the front axle assembly with the nut.
Torque:
133 N·m {1356 kgf·cm, 98 ft·lbf}
NOTICE:
(c) Install a new cotter pin.
NOTICE:
Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.
2. INSTALL FRONT AXLE ASSEMBLY
Click here
InspectionToyota CH-R Service Manual > Transmission Control Cable: Components
COMPONENTS
ILLUSTRATION
*1
NO. 1 ENGINE UNDER COVER
*2
REAR ENGINE UNDER COVER LH
N*m (kgf*cm, ft.*lbf): Specified torque
-
-
ILLUSTRATION
*A
w/ Cover
*B
...
Toyota CH-R Service Manual > Rear Stabilizer Bar: Inspection
INSPECTION
PROCEDURE
1. INSPECT REAR STABILIZER LINK ASSEMBLY
(a) Inspect the turning torque of the ball joint.
(1) Secure the rear stabilizer link assembly in a vise using aluminum plates.
NOTICE:
Do not overtighten the vise.
(2) Install the nut to the rear stabilizer link assembly stud.
...